Building Permit Drawings Rejected? 10 Costly Mistakes Ontario Homeowners Make (And How to Avoid Them)

Getting your building permit drawings rejected isn’t just frustrating — it’s expensive. Delays can cost you weeks or months of lost contractor time, seasonal weather changes, and mounting re-application fees. In Ontario, where the Ontario Building Code requires permits for any new construction, addition, or structural alteration over 10 square metres, getting your drawings right the first time is essential.
The consequences of permit violations are severe. Under Ontario’s Building Code, you can face fines up to $50,000 for a first offense and $100,000 for subsequent violations. Your municipality can even force you to demolish completed work at your own expense. Understanding common mistakes before submission can protect you from these costly outcomes.
1. Not Getting a Permit at All
The biggest mistake homeowners make is bypassing the permit process entirely. Some believe smaller projects don’t require permits, while others hope to save money by avoiding fees. This gamble rarely pays off.
If you’re purchasing a property, always have it inspected for unpermitted work. Unlawful building or remodeling can prevent you from making future repairs and expose you to severe penalties. When municipalities discover unpermitted work, they typically require you to obtain retroactive permits — often involving bringing the work up to current code standards: a much more expensive proposition than getting permits upfront.
2. Submitting Incomplete Applications
Incomplete applications are among the most frequent reasons for immediate rejection. This includes unanswered form questions, missing signatures, absent documentation, and incomplete project descriptions.
Building departments process hundreds of applications monthly. Incomplete submissions create immediate red flags that result in automatic rejection without review. Double-check every section of your application package before submission. Create a checklist based on your municipality’s requirements or work with a permit services professional to ensure nothing is overlooked.

3. Missing Critical Technical Details
Many homeowner-prepared drawings lack the technical specifications that building officials need to verify OBC compliance. Essential details often missing include:
- Structural framing layouts and load calculations
- Foundation specifications and drainage details
- Insulation values and energy efficiency ratings
- Fire separation requirements and ratings
- Daylighting calculations for natural light
- Window sizing and egress specifications for bedrooms
Without these elements, building departments typically issue revision requests that can add weeks to your approval timeline. Each revision cycle delays your project start date and can push construction into less favorable seasons.
4. Using Inaccurate or Outdated Drawings
Your drawings must accurately represent the actual construction planned. Outdated plans, incorrect measurements, or drawings that don’t match the final design will result in rejection.
Common issues include:
- Incorrect property dimensions or setbacks
- Wrong ceiling heights or floor levels
- Outdated site conditions or existing structure details
- Conflicting information between sheets
A professional site plan drawing or on-site measurement review ensures your drawings reflect current conditions.
5. Failing to Meet Building Code Requirements
Not familiarizing yourself with current Ontario Building Code requirements before submission is a critical error. Building codes are complex documents covering safety standards, structure, fire protection, and environmental regulations.
Common code failures include:
- Inadequate egress windows in basement apartments
- Missing or insufficient fire separation
- Undersized structural supports
- Non-compliant HVAC ventilation layouts
Code non-compliance is the single most common reason for permit denial. Always confirm your designer or drafter is BCIN-qualified to prepare residential building permit drawings in Ontario.
6. Overlooking Mechanical and Structural Elements
Even well-drawn floor plans often fail review because they lack mechanical and structural information. Building officials need to understand how your project will be built, not just what it will look like.
Required details include:
- Foundation design and specifications
- Roof framing and load distribution
- HVAC design and duct layouts
- Plumbing and electrical rough-in
- Structural connections and fasteners
These are where most DIY drawings fall short. Missing structural details often require mid-process consultations with engineers or BCIN designers to complete.

7. Skipping Professional Stamps and Certifications
While Ontario homeowners can legally prepare their own drawings, professionally stamped drawings from BCIN designers, architects, or engineers carry major advantages.
A professional stamp shows that qualified experts have reviewed the drawings for code compliance, structural integrity, and safety. Building officials have greater confidence in stamped drawings, leading to faster approvals and fewer revisions.
With homeowner sketches, you must prove compliance for every code requirement. Missing details that professionals include automatically can significantly slow the process.
8. Forgetting Supporting Documentation
Many permit applications require more than drawings. Supporting documentation often includes:
- Engineering reports for structural changes
- Energy efficiency calculations
- Fire safety assessments
- Environmental impact reports
- Property surveys and site plans
- Proof of insurance or contractor licensing
Missing documents lead to automatic rejection. Review all application requirements thoroughly or partner with an experienced permit designer to gather everything needed upfront.
9. Neglecting Local Zoning Verification
Building permits and zoning are related but separate. Your project must comply with both before approval.
Common zoning mistakes include:
- Exceeding maximum height limits
- Violating setback distances
- Surpassing lot coverage ratios
- Building non-permitted uses in residential zones
Verify your zoning before developing detailed drawings. Our zoning and site plan review service helps ensure your design fits municipal bylaws.

10. Poor Communication with Local Authorities
Failing to engage early with your local building department often leads to preventable rejection.
Tips for better communication:
- Schedule pre-application meetings to confirm requirements
- Ask about local interpretations of code provisions
- Clarify submission and revision procedures
- Build a positive working relationship with plan reviewers
Good communication prevents many issues before they occur and helps you avoid unnecessary revision cycles.
✅ How to Avoid These Costly Mistakes
The best way to avoid rejection is to invest in professional building permit drawings from the start. BCIN-qualified designers ensure your drawings are code-compliant, detailed, and ready for municipal review.
Consider the hidden costs of DIY permit drawings:
- Multiple revision cycles and lost weeks
- Contractor delays due to permit holdups
- Weather-related construction setbacks
- Re-application fees and wasted time
Professional drawings typically cost far less than the combined expense of revisions, delays, and stress. Getting it right the first time saves money and momentum.
🚀 Your Next Steps
Before you apply, evaluate your project’s complexity and your comfort with code compliance. For simple additions, decks, or basement suites, preparation may suffice — but for larger or structural projects, professional support is worth every penny.
Ready to ensure your application succeeds the first time?
Contact Neo-Scenic Designs to speak with our BCIN-qualified team.
We create detailed, Ontario Building Code-compliant drawings that building departments approve efficiently, helping you avoid costly mistakes and keep your project on schedule.